Experts in water remineralization

Projects

An exceptionally broad portfolio of products and services makes Drintec Solutions your ideal partner for small and large scale projects.

Limestone contactors in FRP tanks
Client / Final client Year Project Flow rate (m3/d) Main parameters Photo
Arsepur/Bechtel
/
Tech
2019 Quebrada Blanca Fase 2
(Chile)
3,600 – 6 FRP tanks
– Ø2 x 4,7 m
– Discharge atmospheric
– 1 Low-pressure CO2 dissolver
Tedagua
/
Onead
2019 Djibouti 22,630 – 14 FRP tanks
– Ø2,325 x 5,3 m
– Discharge atmospheric
– 1 Low-pressure CO2 dissolver
Prominent
/
Kvarnåkershamn’s waterworks
2018 Gotland
(Sweden)
7,500 – 5 FRP tanks
– Ø2,325 x 5 m
– Discharge atmospheric
– 1 Low-pressure CO2 dissolver
Canaragua
/
Consejo insular de aguas de Gran Canaria
2018 La aldea de San Nicolás
(Canary Islands)
2,700 – 2 FRP tanks
– Ø2 x 5.4 m
– Discharge atmospheric
– 1 low-pressure CO2 dissolver
audingIntraesa
/
Aigües del Prat
2018 ETAP Sagnier
(Spain)
3,600 – 2 FRP tanks
– Ø2.5 x 5.3 m
– Discharge atmospheric
– 1 low-pressure CO2 dissolver
Aqualia-FCC
/
Spanish Ministry of Public Works
2017 La Caleta
(Canary Islands)
10,000 – 6 FRP tanks
– Ø2.2 x 5.8 m
– Discharge atmospheric
– 1 low-pressure CO2 dissolver
Yonsan Engineering
/
Maldives Airport
2017 Maldives Airport 1.600 – 2 FRP tanks
– Ø1.84 x 4.6 m
– Discharge atmospheric
AES Arabia Ltd
– Tecnicas Reunidas
/
Saudi Aramco
2016 Jazan
(Saudi Arabia)
6,000 – 4 FRP tanks
– Ø2.2 m
– Discharge atmospheric
Elmasa
/
Elmasa
2016 Maspalomas
(Canary Islands)
19,500 – 13 FRP tanks
– Ø2.2 x 5.4 m
– Discharge atmospheric
– 1 low-pressure CO2 dissolver
AES Arabia Ltd(Hyundai Heavy Industries)
/
Saudi Electricity Company
2015 Jeddah
(Saudi Arabia)
2 x 720 – 2 FRP tanks
– Ø2.2 m
– Discharge atmospheric
Elmasa
/
Elmasa
2012 Maspalomas
(Canary Islands)
12,000 – 10 x FRP Tanks
– Ø2 x 5.5 m
– Discharge atmospheric
Sadyt
/
Manto VerdeMining company
2011 Mantoverde
(Atacama, Chile)
11,000 – 10 x FRP Tanks
– Ø2 x 5.6 m
– Discharge atmospheric
Tagua
/
Carlton-Ritz Hotels
2011 Tenerife
(Canary Islands)
4,000 – 4 x FRP tanks
– Ø1.86 x 5.5 m
– Discharge atmospheric
– 1 low-pressure CO2 dissolver
Lynagua
/
Oil company
2009 Oman 2,000 – 2 x FRP tanks
– Ø2 x 4,2 m
– Discharge atmospheric
– 1 low-pressure CO2 dissolver
Cadagua
/
Spanish Ministry of Public Works
2004 Balearic Islands
(Spain)
4,000 – 4 x FRP tanks
– Ø1.86 x 4 m
– Discharge atmospheric
Loroparque, Hotel Costa Caleta, Veolia, Facebook, Cadagua, Spanish Ministry of Public Works, etc. Since 2004 Small projects around the globe Up to 600 – 1 x FRP tank
– Discharge atmospheric
Limestone contactors in concrete cells
Client / Final client Year Project Flow rate (m3/d) Main parameters Photo
Tedagua
/
BHP
2019 Spence Growth options
(Chile)
86,830 – 16 Rectangular concrete cells
– 3 x 7 m
Tedagua
/
Sedapal
2019 Provisur
(Peru)
37,700 – 4 Rectangular concrete cells
– 4 x 8 m
Aqualia-FCC
/
Spanish Ministry of Public Works
2017 Fonsalía
(Canary Islands)
14,000 – 4 Rectangular concrete cells
– 2 x 6 m
– 1 low-pressure CO2 dissolver
Cadagua
/
Spanish Ministry of Public Works
2015 Granadilla
(Canary Islands)
14,000 – 4 Rectangular concrete cells
– 2 x 6 m
– low-pressure CO2 dissolver
Canal Isabel II
/
Spanish Ministry of Public Works
2015 Janubio
(Canary Islands)
11,800 – 4 Rectangular concrete cells
– 2 x 6 m
– 1 low-pressure CO2 dissolver
Ferrovial
/
Tenerife Water Council
2014 Adeje
(Canary Islands)
30,000 – 4 Rectangular concrete cells
– 3 x 7 m
– 1 low-pressure CO2 dissolver
Sadyt
/
Mekorot
2014 Ashdod
(Israel)
384,000 – 40 Rectangular concrete cells
– 3 x 7 m
– 4 low-pressure CO2 dissolvers
Acciona Agua
/
Spanish Ministry of Public Works
2013 Telde
(Canary Islands)
16,000 – 6 Rectangular concrete cells
– 2 x 6 m
– Discharge atmospheric
Degremont
/
ATLL(Catalunya Water Authority)
2010 Barcelona
(Spain)
200,000 – 32 Rectangular concrete cells
– 3 x 7 m
– Discharge atmospheric
Inima
/
Spanish Ministry of Public Works
2007 Alicante II
(Spain)
80,000 – 28 Rectangular concrete cells
– 2 x 5 m
– Discharge atmospheric
Local construction company
/
Gran Canaria Water Council
2007 Guía
(Canary Islands)
10,000 – 2 Rectangular concrete cells
– 2 x 5 m
– Discharge atmospheric
Limestone contactors in steel tanks
Client / Final client Year Project Flow rate (m3/d) Main parameters Photo
Acciona Agua
/
Qatar Water and Electricity Authority
2016 Ras Abu Fontas 3
(Qatar)
164,800 – 12 steel tanks
– Ø5 x 6 m
– Discharge atmospheric
– 2 low-pressure CO2 dissolvers
Limestone contactors in open top containers
Client / Final client Year Project Flow rate (m3/d) Main parameters Photo
Corodex
/
Abengoa
2015 Masdar Institute
(Abu Dhabi)
1,080 – 1 open top container
– 1.8 x 4.1 m
– 2.3 m total height
– Discharge atmospheric
– 1 low-pressure CO2 dissolver
Contact us for more information

Desarrolado por www.e-cheide.com

Copyright © 2019 LCCH. All Rights Reserved.